翻訳と辞書
Words near each other
・ Kaveri
・ Kaveri (1955 film)
・ Kaveri (1975 film)
・ Kaveri (1986 film)
・ Kaveri (actress)
・ Kaveri (disambiguation)
・ Kaveri delta coal-bed methane project
・ Kaveri Express
・ Kaveri Grameena Bank
・ Kaveri Jha
・ Kaveri Kachari
・ Kaveri Kaul
・ Kaveri Nagar
・ Kaveri Palam
・ Kaveri Pushkaram
Kaveri River water dispute
・ Kaverin
・ Kaveripakkam
・ Kaveripakkam block
・ Kaveripattinam (Dharmapuri)
・ Kaveripattinam (State Assembly Constituency)
・ Kaveripattinam block
・ Kaveri–Vaigai link canal
・ Kavery Nambisan
・ Kavesar
・ Kavečany
・ KAVH
・ Kavhan
・ Kavi
・ Kavi Bhushan


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Kaveri River water dispute : ウィキペディア英語版
Kaveri River water dispute

The sharing of waters of the Kaveri river has been the source of a serious conflict between the Indian states of Karnataka and Tamil Nadu. The genesis of this conflict rests in two agreements in 1892 and 1924 between the erstwhile Madras Presidency and Princely State of Mysore. The Kaveri river 〔Sood, Jyotika (31 October 2012). ("The paddy compulsion" ). Down to Earth.〕 has 44,000 km2 basin area in Tamil Nadu and 32,000 km2 basin area in Karnataka.
Karnataka contends that it does not receive its due share of water from the river. It claims that the agreements were skewed heavily in favor of the Madras Presidency, and has demanded a renegotiated settlement based on "equitable sharing of the waters". Tamil Nadu, on the other hand, pleads that it has already developed almost 3,000,000 acres (12,000 km2) of land and as a result has come to depend very heavily on the existing pattern of usage. Any change in this pattern, it says, will adversely affect the livelihood of millions of farmers in the state.
Decades of negotiations between the parties bore no fruit. The Government of India then constituted a tribunal in 1990 to look into the matter. After hearing arguments of all the parties involved for the next 16 years, the tribunal delivered its final verdict on 5 February 2007. In its verdict, the tribunal allocated 419 billion ft³ (12 km³) of water annually to Tamil Nadu and 270 billion ft³ (7.6 km³) to Karnataka; 30 billion ft³ (0.8 km³) of Kaveri river water to Kerala and 7 billion ft³ (0.2 km³) to Puducherry. The dispute however, appears not to have concluded, as all four states deciding to file review petitions seeking clarifications and possible renegotiation of the order.


==History of the dispute==
The British controlled both Mysore and Madras for a short period in the middle of the 19th century. During their regime, numerous plans were drawn up for the utilization of the Kaveri waters by both states. However, the drought and subsequent famine in the mid-1870s put a hold on the implementation of these plans. The plans were revived by Mysore in 1881, by which time Mysore was back in the hands of the Mysore kings, while present day Tamil Nadu continued to remain a part of the Madras Presidency.
Mysore's plans to revive the irrigation projects met with resistance from the Madras Presidency. Mysore state made a representation to the then British government; as a result of which, a conference was held in 1890 with the objective of agreeing "…on the principles of a modus vivendi, which would on the one hand allow to Mysore in dealing with irrigation works, and on the other, give to Madras practical security against injury to interests" and eventually the Agreement of 1892 was signed.
Things came to a head in 1910 when Mysore, under Nalvadi Krishnaraja Wodeyar as the king and Sir. M.Visvesvaraya as Chief Engineer came up with a plan to construct a dam at Kannambadi village to hold up to 41.5 TMC of water. The dam was planned to be built in two stages. In the first stage a capacity of 11 TMC was envisioned, while in the second stage the full capacity was set to be realized. Madras however, refused to give its consent for this move as it had its own plans to build a storage dam at Mettur with a capacity of 80 TMC.
After a reference to the Government of India, permission was accorded to Mysore, but for a reduced storage of 11TMC. During construction, however, the foundation was laid to suit the earlier desired full storage. This raised Madras' hackles and the dispute continued. As a result, the then British Government of India referred the matter to arbitration under Rule IV of the 1892 Agreement. The Kaveri dispute thus had come up for arbitration for the first time.
Sir H D Griffin was appointed arbitrator and M. Nethersole, the Inspector General of Irrigation in India, was made the Assessor. They entered into proceedings on 16 July 1913 and the Award was given on 12 May 1914. The award upheld the earlier decision of the Government of India and allowed Mysore to go ahead with the construction of the dam up to 11 TMC.
Madras appealed against the award and negotiations continued. Eventually an agreement was arrived at in 1924 and a couple of minor agreements were also signed in 1929 and 1933. The 1924 agreement was set to lapse after a run of 50 years.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Kaveri River water dispute」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.